Compliance & Documentation

Compliance built into the workflow, not bolted on

Track AHJ permits, NEM interconnection, and ITC tax credit documentation without spreadsheets. Built for US solar, battery, and EV installers.

app.payaca.com

MCS Documentation

3/5 Complete
Heat loss calculationAuto-generated
MIS 3005 compliance check
Customer declaration
Installation certificate
DNO notification
Audit-ready documentation
There was nobody we could see in the market that offered a tenth of what Payaca did.
AS
Andy Sellick
CTO, OVO Solar & Heating

US clean tech installers don't get a single compliance standard to build against. Permitting requirements vary by Authority Having Jurisdiction, interconnection rules vary by utility, and there's no MCS-style national scheme tying it together. That fragmentation is exactly why generic CRMs and spreadsheets break down past a handful of jobs running at once.

Payaca tracks the three things that actually block a project from closing out: AHJ permit state (submission, plan review, inspection, approval) as custom fields against the project; NEM interconnection as its own workflow (application, witness test, Permission to Operate) so commissioning never gets ahead of utility sign-off; and the Investment Tax Credit documentation chain - date placed in service, system cost basis, equipment serials, installer credentials - captured when the job is commissioned, not reconstructed from memory when the homeowner asks for it at tax time. NABCEP certification and state contractor license renewals sit against staff records, so the office can see who's qualified before a job gets assigned.

None of this depends on Payaca integrating with a specific AHJ portal or utility - the workflow is configurable to whichever jurisdiction and utility you're dealing with, which is the only approach that scales when there's no single standard.

What's included

Everything you need to compliance built into the workflow, not bolted on.

AHJ Permit Tracking

Track permit state by Authority Having Jurisdiction using custom fields and pipeline stages - submission date, plan review, inspection date, approval. Every AHJ portal works differently; your workflow doesn't have to change with it.

NEM Interconnection & PTO

Track utility interconnection as its own workflow, separate from the permit: application, witness test, Permission to Operate (PTO). Gate commissioning on PTO so a system is never turned on before the utility signs off.

ITC Tax Credit Documentation

Capture the Investment Tax Credit documentation chain at commissioning - date placed in service, system cost basis, equipment serial numbers, installer credentials - so the homeowner's IRS Form 5695 evidence is ready, not assembled by hand at year end.

NABCEP & License Tracking

Track NABCEP certification and state contractor license renewal dates against staff records, so the office knows who's qualified for a job - and whose credentials are about to lapse - before assigning work.

Frequently asked questions

How does Payaca help with AHJ permit tracking?
Use custom fields and pipeline stages to track permit state by Authority Having Jurisdiction - submission date, plan review status, inspection date, and approval. Every AHJ portal works differently, so the workflow is configurable rather than fixed to one jurisdiction's process.
Does Payaca track NEM interconnection separately from the permit?
Yes. Interconnection with the utility (application, witness test, Permission to Operate) runs on its own timeline, independent of the AHJ permit. Payaca models interconnection state as its own project fieldset so the install team can see where a project sits with the utility, not just with the building department.
Can Payaca gate commissioning on Permission to Operate (PTO)?
Yes. Track PTO status against the project and use it as a checkpoint before commissioning, so a system doesn't get turned on before the utility has signed off.
Does Payaca help document the federal Investment Tax Credit (ITC)?
Yes. Capture the documentation chain - date placed in service, system cost basis, equipment serial numbers, installer credentials - as project data at commissioning. That evidence is what a homeowner (or their accountant) needs for IRS Form 5695, ready when they ask instead of assembled by hand at year end.
Can Payaca track NABCEP certification and contractor licenses?
Yes. Track NABCEP certification and state contractor license renewal dates as fields against staff records, so you can see who's qualified for a job - and catch a lapsing credential - before you assign the work, not on inspection day.
How does document management work for US installers?
All permits, warranties, manuals, survey packs, and compliance documents are stored against the relevant project - files up to 250MB, in the formats installers work in day to day (PDF, CAD, images, spreadsheets and more). Your team can access them from any device, in the office or on site.
Can Payaca manage inspection scheduling?
Yes. Schedule AHJ inspection tasks with automatic reminders for your team. Track results within the project workflow and manage any follow-up actions required before final sign-off.
Why not just track this in spreadsheets?
Most installers start there. It works until a project is thirty steps behind because AHJ permit state, interconnection status, and ITC documentation each live in a different tab with no link back to the job. Structured fields against the project mean the data survives staff turnover and shows up in reporting, not just in whoever built the spreadsheet's head.
Dedicated onboarding available

Ready to streamline your clean tech operations?

Join 500+ installers who've transformed their business with Payaca. We'll handle your workflow mapping, process optimisation, and data migration.

Dedicated onboarding
Data migration support
AI + human support