All updates

Agent Dave is better at managing materials on a project

Improvement·
Martha Hearn, Senior Software Engineer

A job doesn't always use exactly what was sent out. A few panels come back unused, or the design changes after the stock has arrived. Agent Dave now understands how materials work on a project, so you can tell Dave what happened and the records stay straight.

Send spare stock back to a stock location

Tell Dave what came back and where it went, for example:

  • "The crew brought 2 spare panels and 2 racking kits back from the Doyle job to the Middletown warehouse. Can you move them back?"

Dave checks what the project has on hand, confirms the quantities with you, then moves the stock. The project's Ordered tab shows it as transferred out to the warehouse, and the stock location has it on hand again, ready for the next job.

Stock goes back at the average cost the project holds it at, so the project's material cost drops by that amount.

More to ask Dave

  • "Add 2 more panels to the Doyle job and take them from the Middletown warehouse." Dave adds them to what the job needs, then moves them in from the warehouse.
  • "The customer's gone for 22 panels instead of 24. Can you update the job?" Dave lowers what the job needs, then asks what happened to the 2 spare panels.
  • "Where did the microinverters on the Doyle job come from?" Dave tells you whether they were bought from a supplier or moved in from a stock location.
  • "What's still to order on the Doyle job?" Dave lists the materials that aren't covered by stock or an order yet.

Moving stock needs stock permissions, which Admins and Super Admins have by default. To correct what a stock location holds, ask Dave to adjust it.

Want to see this working?

Request a demo and we'll show you on the kind of projects you run, or watch short clips of the app first.