MCS Technical Supervisor: requirements and who can hold it
The redeveloped MCS scheme puts a named Technical Supervisor on every certificate. The evidence MCS expects, what they answer for, and who can hold it.
England relaxed permitted development for air source heat pumps, but the right hinges on an MCS 020 noise assessment under 42 dB(A). A practical guide for UK installers on what changed and where jobs slip into a full planning application.
Permitted development is the quiet part of a heat pump job. Nobody talks about it in the sales conversation, it rarely comes up on the survey, and most of the time it just works. Then one install in twenty has a neighbour's window in the wrong place, the noise assessment comes in too high, and a three-week job turns into an eight-week wait for a householder planning application. The margin you priced in is gone, and the customer is asking why the timeline moved.
The rules changed in the installer's favour over the last year - but they also moved the whole decision onto one calculation you have to get right at survey stage. Here is what actually applies now.
Two dates matter, and they are a year apart.
29 May 2025 - the Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2025 came into force and relaxed the physical limits on domestic air source heat pumps:
28 May 2026 - the noise side of the right tightened up. MCS 020(a), the sound calculation standard, is now the sole permitted scheme for demonstrating that an installation meets the permitted development noise condition. There is no longer an alternative route: if the job is going in under PD, the assessment is done to MCS 020(a), full stop. (Using the standard has been mandatory for PD installs since 20 September 2025; the 28 May 2026 change removed the last alternatives.)
The headline reads like deregulation, and for the physical siting it is. But permitted development for an air source heat pump has always been conditional, and the binding condition is now the noise assessment. Get that wrong and none of the relaxations help you - the installation simply isn't permitted development, and it needs planning permission before it goes in.
Permitted development requires that the sound from the heat pump does not exceed 42 dB(A) at the assessment position - the nearest habitable room at the neighbouring property most likely to be affected. MCS 020(a) is the method you use to prove, before you install, that you will land under that figure.
This is where jobs quietly fail, because the calculation is less forgiving than it looks:
None of this is difficult once it is part of the survey. The failure mode is treating it as a box-tick after the fact, discovering at design stage that the chosen location won't pass, and having to move the unit, add an acoustic barrier, or fall back to a planning application.
The cost of getting permitted development wrong is rarely the assessment itself. It is everything downstream:
The installers who handle this cleanly do the same thing every time: they capture the noise-relevant facts at survey - unit model and its sound power figure, the proposed location, what is within a metre of it, and the distance and sightline to the nearest neighbouring window - and they run the MCS 020(a) check before the design is signed off, not after. The location decision is made once, with the number in hand.
That is a data-capture habit as much as a compliance one. In Payaca you can build the site-survey inputs into a custom fieldset on the project, attach the completed MCS 020 assessment and the MCS certificate to the same record, and keep them against the job rather than in someone's inbox - so when a customer or a neighbour asks two years later, the permitted development evidence is where the job is. The calculation is still yours to run to the standard; the point is that the inputs and the record live in one place instead of being reconstructed from memory.
Keeping the survey inputs, the noise assessment and the certificate on one project record is the difference between permitted development being a non-event and it being the thing that blew your timeline. If your team is still reconstructing that paperwork job by job, book a demo and we'll show you how installers keep it in one place.
Sources: The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2025; Planning Portal - Air source heat pump permitted development; MCS 020(a) Air Source Heat Pump Sound Calculation. Figures current at time of writing (July 2026); confirm against the primary sources for each job.
See how Payaca helps clean tech installers save time and grow their business.
Book a demoWant more from Payaca in your Google results?

The redeveloped MCS scheme puts a named Technical Supervisor on every certificate. The evidence MCS expects, what they answer for, and who can hold it.

The Boiler Upgrade Scheme moved to V5 on 28 April 2026. The voucher mechanism is unchanged - what's new is the mandatory upfront discount on the customer's quote and invoice. Here's how that changes installer cash flow, T&Cs, and template configuration.

Batteries have no permitted development class of their own. When a home battery needs planning permission, and what to capture at survey.