How-to Guide

How much deposit should you ask for?

Most install businesses default to a 10% deposit. Here's when that number costs you money, and why a fixed amount like £500 works better on more of your jobs.

Ask a room of install business owners what deposit they take and most of them will say "10%". It's the number the industry inherited, it sounds reasonable, and it means nobody has to think about it again. That last part is the problem. A percentage that nobody questions quietly prices your small jobs wrong, shocks your grant-funded customers, and makes you re-do the same bit of admin on every quote you send.

This is a practical guide to getting the number right: why a fixed amount beats a percentage for most clean tech work, how to stop the fixed amount misfiring on your smallest jobs, and how to set it once so every quote starts with the deposit already decided.

One system for your install jobs, from first enquiry to final invoice.Book a demo

Why the deposit exists at all

A deposit isn't a discount or a formality. It does three specific jobs:

  1. It confirms commitment. A customer who has paid something is a customer who has decided, which matters when you're juggling survey dates across a busy season.
  2. It covers upfront cost. Materials, scaffolding, equipment hire. On a heat pump or battery job you're often committing real money before install day, and the margin math starts before the van leaves the yard.
  3. It protects the slot. Once a deposit is paid, cancellations get rarer and rebooking conversations get shorter. What a deposit doesn't do is override the customer's cancellation rights, which is worth understanding properly before you write your terms (see deposits and cancellation rights).

None of those three jobs says anything about percentages. Which raises the question of why 10% is the default.

Where the 10% deposit goes wrong

A percentage deposit scales with the job. That sounds fair. In practice it fails at both ends of your price range.

On small jobs it's too little. An EV charger install at £1,800 with a 10% deposit gets you £180. That doesn't cover a failed payment, never mind the survey time you've committed. The job is real, the commitment isn't.

On big jobs it's too much. A £40,000 retrofit at 10% asks the customer for £4,000 before you've lifted a tool. Some customers will pay it. A good number will stall, shop around, or quietly go cold, and your pipeline shows it as a quote that never converted.

On grant-funded jobs it's actively misleading. This is the one most clean tech businesses hit. Take a heat pump install priced at £12,000 with a £7,500 Boiler Upgrade Scheme grant applied. The customer's actual bill is £4,500. A 10% deposit calculated on the full price is £1,200, which is over a quarter of everything that customer will ever pay you, demanded upfront, before the grant has even landed. If you're quoting BUS grant work or adding grants to your proposals, this is the deposit conversation your customers are already having in their heads.

The fixed amount alternative

The fix is to stop asking a percentage and ask a number: £500, or whatever your jobs actually need. The same deposit on every job, regardless of price.

It works because the three jobs a deposit does (commitment, upfront cost, slot protection) cost roughly the same on a £1,800 job and a £40,000 one. Your survey is the same hour. Your rebooking risk is the same conversation. The number should reflect what the deposit is for, not the size of the job it's attached to.

It also sells better than you'd expect. "£500 to secure your install date" is easier to say yes to than "10% of the total", because the customer can picture it and doesn't need a calculator. On the grant example above, a fixed £500 with the balance split between install and completion means the customer sees deposit £500, then £2,000 at install, then £2,000 on completion. Their £4,500 bill, laid out in three plain numbers, with no arithmetic that makes them wonder whether the deposit is fair.

One guard rail: cap it on small jobs

A fixed deposit can overshoot the other way. If you ask £500 on a £1,000 job, you're taking half the value upfront, which looks aggressive and can trip your own cancellation terms.

The answer is a cap: the fixed amount, but never more than a set percentage of the job. £500 capped at 25% on that £1,800 EV charger works out at £450. You keep almost all of the deposit, the customer sees a number proportionate to their job, and nobody has to hand-adjust anything per quote. Fixed amount deposits with an optional cap are now built into payment schedules, so the guard rail is a setting, not a habit.

Set it once, quote it every time

The businesses that actually stick with a deposit policy are the ones that set it once. Put your deposit (and its cap) on your proposal template and every quote you build starts with it already in place. You can still override it on the odd job that needs it, but the default is decided by you, in advance, rather than re-negotiated quote by quote.

While you're in there, two related pieces worth wiring up: automating what happens when the deposit is paid, so a paid deposit triggers the next step instead of you checking the bank; and making sure your payment schedules and job records live in the same place as your quotes, so the deposit, the invoice and the margin on the job stay in sync. If your current setup makes that awkward, it may be less a deposit problem and more a software problem.

What to do this week

  1. Look at your last ten jobs and work out what a deposit would need to cover: survey time, upfront materials, the cost of a rebooking.
  2. Pick your fixed number. For most clean tech install businesses it lands between £250 and £500.
  3. Set the cap. 25% of the total is a sensible ceiling that protects your small jobs.
  4. Put it on your proposal template so it stops being a decision you make twice a week.

Then watch your quote-to-booking rate on the next batch of proposals. The deposit is one of the few numbers in your quoting flow you can change once and measure for a month.

If you want to see how fixed deposits, caps and grant interaction sit inside a proposal before you change your own template, book a demo and we'll walk through it on a live example.

Ready to streamline your operations?

See how Payaca helps clean tech installers save time and grow their business.

Book a demo

Want more from Payaca in your Google results?

Related articles

How long does MCS certification take?
How-to Guide

How long does MCS certification take?

MCS publishes no fixed timescale for certification. What actually sets the clock: the stages, the installation you need first, and the parts you can't compress.

Migrating from Commusoft to Payaca: what actually moves
How-to Guide

Migrating from Commusoft to Payaca: what actually moves

A first-hand guide for UK heating and renewables businesses moving off Commusoft. What the backup export contains, how it maps onto Payaca, what comes across cleanly, what gets rebuilt, and how we sequence the move.