
Who is my DNO, and do you actually need to know?
Your DNO is whoever owns the network at the property, not the energy supplier. How to look it up, and when you don't have to.
Jamie Duncan
6 October 2026
7 articles tagged with DNO Compliance

Your DNO is whoever owns the network at the property, not the energy supplier. How to look it up, and when you don't have to.
Jamie Duncan
6 October 2026

The G99 Fast Track process connects small generation and storage installations in around 10 working days instead of a full G99 assessment. The three SGI categories, the forms, and the details that keep an application moving.
Jamie Duncan
5 October 2026

'Further information required' is not a rejection. What the status means, where the DNO actually contacts you, and what it does to the 45-working-day clock.
Jamie Duncan
7 September 2026

G98 and G99 are decided by one number: 16A per phase, measured across everything installed at the property, not per device. The comparison table, the G99 Fast Track route that sits between the two, and the design-capacity rule most guides get wrong.
Jamie Duncan
31 August 2026

Payaca now shows the DNO's own reasons on a 'works required' connection application, so installers know whether they're waiting on paperwork or a network upgrade.
Jamie Duncan
24 August 2026

When a full-export G99 connection would be refused or need reinforcement, an export limitation scheme (ENA EREC G100) keeps the job alive. Here is how it works and how to track it across a busy install schedule.
Jamie Duncan
24 July 2026

A G99 application covers any system above the G98 threshold and has to be approved before you install. What triggers one, how long approval takes on each network, and the errors that send it back.
Jamie Duncan
29 June 2026