How-to Guide

Do you need F-gas certification to install heat pumps?

When heat pump work triggers F-gas requirements: monobloc vs split units, individual qualifications, company certification, and what the rules say in plain terms.

A plumbing or heating business adding heat pumps usually hits the question at the worst moment: the unit is on the drive, the customer has a grant voucher waiting, and somebody realises the spec sheet mentions refrigerant. Does fitting this thing legally require F-gas certification, or not?

The short answer is that it depends on the unit, not on the brand of certification you already hold. Monobloc heat pumps usually don't need F-gas. Split systems do. And the rules come in two layers, one for the person doing the work and one for the business, which catches out sole traders who assume a personal certificate covers everything. Here's how it actually works.

Key points

  • The F-gas requirement attaches to work on the refrigerant circuit. A monobloc heat pump arrives with its refrigerant sealed inside the outdoor unit, so connecting the water pipes inside doesn't involve refrigerant handling.
  • Split heat pumps need refrigerant pipework and connections made on site. That work needs a qualified person and a certified business, including sole traders.
  • Individual qualifications come in categories 1 to 4. Category 1 covers all activities; category 2 covers systems under 3kg (or 6kg if hermetically sealed).
  • Company certification comes from Refcom, the F-Gas Register (Quidos) or Bureau Veritas, and renews every 3 years.
  • F-gas is a separate legal regime from MCS. Holding one doesn't cover you for the other.
One system for your install jobs, from first enquiry to final invoice.Book a demo

What the law actually requires

The rules come from the Fluorinated Greenhouse Gases Regulations, which govern anyone working on equipment containing F gases, the refrigerants used in most heat pumps and air conditioning. Per gov.uk, for stationary refrigeration, air conditioning and heat pump (RACHP) systems you must hold qualifications to install new systems, service and maintain them, check for leaks, recover gases, and decommission old systems. Working without them is against the law and carries civil penalties.

Two separate obligations sit on top of each other:

  1. The individual qualification. Whoever handles the refrigerant needs a personal certificate. There are four categories: category 1 covers all activities, category 2 lets you install, maintain, service and recover on systems containing less than 3kg of F gas (or under 6kg if hermetically sealed), category 3 is recovery only under the same limits, and category 4 is leak checking without breaking into the circuit. Qualifications come from City & Guilds, BESA or LCL Awards; CITB no longer issues new F-gas certification.
  2. The company certificate. Per gov.uk's company certification guidance, a business, including a sole trader, must be certified by an approved body to install, repair, maintain or decommission stationary equipment containing F gas operated by others. Certification comes from Refcom Certification Ltd, the F-Gas Register (Quidos) or Bureau Veritas, and renews every 3 years.

Note the "operated by others". A company servicing only its own equipment doesn't need the company certificate. A heat pump business installing for customers does.

Monobloc vs split: where the line falls

The requirement attaches to work involving the refrigerant circuit, and that's what separates the two common unit types.

Monobloc air source heat pumps carry the entire refrigerant circuit inside the factory-sealed outdoor unit. The indoor connections are water: flow and return pipes, nothing else. No refrigerant is handled, no circuit is opened, so manufacturer guidance is consistent that fitting one doesn't require F-gas certification. Baxi's professional guidance says it plainly for its monobloc units.

Split systems put part of the refrigerant circuit indoors. The two halves are joined on site with refrigerant pipework, flare connections and, on most units, breaking into the circuit to charge or check it. That work is squarely inside the F-gas regime: it needs an individually qualified person, working for a certified business.

The practical trap is that the line isn't drawn by the marketing category, it's drawn by the unit. "Mostly monobloc" ranges include split variants, and a one-off split job inside a monobloc-heavy schedule still needs the full certification chain. Check the specific model's installation requirements before you commit the date, and if the answer is unclear, the manufacturer's technical team is the source of truth, not the sales sheet. If you're at the stage of choosing what to fit, the design decisions that drive heat pump installs affect more than the F-gas question.

One more wrinkle worth knowing: the refrigerant itself matters. F gas means fluorinated greenhouse gases. Hydrocarbons like propane (R290) aren't F gases, so a propane unit sits outside the F-gas certification regime entirely. That doesn't make it work anyone can do, handling a flammable refrigerant safely is its own competence. But it does mean the compliance picture is shifting under the industry's feet as manufacturers move away from R32, and the unit on your van this year may not match last year's answer.

Where this sits against MCS

F-gas and MCS are separate regimes, run by different bodies, checking different things. MCS certification is about workmanship, consumer protection and scheme requirements for the technologies you certify in. F-gas is environmental law about refrigerant handling. One doesn't substitute for the other: an MCS-certified business fitting splits without F-gas certification is non-compliant on the F-gas side, and an F-gas certified refrigeration business selling heat pump installs to householders needs the MCS side for grant-eligible work, because BUS vouchers run through MCS-certified businesses.

If you're building the compliance file for a heat pump offer, the pieces stack: scheme certification (consumer code membership stopped being mandatory on 18 June 2026 for businesses on the redeveloped MCS Scheme, when DESNZ recognised it as a Boiler Upgrade Scheme Code of Practice, though it still applies on the legacy scheme until the transition closes on 31 March 2027, see do you still need a consumer code?), the Technical Supervisor's qualifications on the MCS side, F-gas on the refrigerant side, and permitted development rules on the planning side. Each has its own evidence, and each expires on its own clock, which is exactly the kind of thing install businesses scaling into heat pumps underestimate.

Sub-contracting doesn't move the obligation

If you sub-contract the refrigerant side of a split install, the sub-contractor's business needs its own company certificate, and the person they send needs their own qualification. The obligation follows the work, not the head contract. That's worth checking before the job, not after, because "the firm we used said they were covered" isn't a defence anyone accepts.

For a business growing past a handful of splits a year, the usual fork is either putting two engineers through a category 1 or 2 qualification and certifying the company, or building a standing relationship with a certified refrigeration firm. The economics of heat pump installs usually decide it: at low volume the sub-contract route wins, and the crossover arrives quietly somewhere around the point where you're scheduling splits every week.

Getting certified, practically

The individual route is a short course and assessment, typically a couple of days for someone already working in heating, delivered by training centres aligned with City & Guilds (the 2079 series), BESA or LCL Awards. The company route is an application to Refcom, Quidos or Bureau Veritas demonstrating you employ trained staff and have written procedures for handling F gases safely. Renewal is every 3 years.

While you're assembling that, the rest of the heat pump workflow doesn't wait. G99 applications for larger installs, commissioning evidence for the grant redemption, and the paperwork from quote to sign-off all run on their own timelines. The businesses that handle the volume well are the ones whose job records carry the F-gas evidence, the commissioning certificates and the DNO correspondence in one place rather than in three contractors' inboxes. That's the same operational visibility that makes MCS scheme checks survivable, and it's worth building before the split jobs start arriving.

If you want to see how a heat pump workflow holds all of that together, from lead to commissioning paperwork, book a demo and we'll walk you through it.

Ready to streamline your operations?

See how Payaca helps clean tech installers save time and grow their business.

Book a demo

Want more from Payaca in your Google results?

Related articles

BUS V5 and the upfront discount: what changed on 28 April 2026
Blog

BUS V5 and the upfront discount: what changed on 28 April 2026

The Boiler Upgrade Scheme moved to V5 on 28 April 2026. The voucher mechanism is unchanged - what's new is the mandatory upfront discount on the customer's quote and invoice. Here's how that changes installer cash flow, T&Cs, and template configuration.

Migrating from Commusoft to Payaca: what actually moves
How-to Guide

Migrating from Commusoft to Payaca: what actually moves

A first-hand guide for UK heating and renewables businesses moving off Commusoft. What the backup export contains, how it maps onto Payaca, what comes across cleanly, what gets rebuilt, and how we sequence the move.